Closed

Construction for the Paradise Dam Improvement Project - Stage 2

Tender ID: 252776


Tender Details

Organisation:
Tender #:
15SW4630  
Status:
Closed
Publish Date:
9 December 2015
Closing Date:
27 January 2016

Tender Description

This Scope describes the works to be undertaken as part of the Dam Safety Improvement Project Stage 2 at Paradise Dam. The works include strengthen of monolith D and K and other ancillary works.

Paradise Dam is situated approximately 20 kms north-west of Biggenden and 80 kms south-west of Bundaberg on the Burnett River at AMTD 131.4 km. The maximum height of the structure is 52 m with the primary construction material being roller compacted concrete (RCC). The dam creates a 45 km long narrow reservoir, with a surface area of 3,000 ha and a storage volume of 300,000 ML.

The Scope of Works includes the following:
* Strengthen of the Toe at Monoliths D and K;
* Repairs to the concrete on the Left Bank Spillway Training Wall;
* Supply and Installation of Baulk between Dam Crest and Intake Tower Stairs;
* Construction of a suitable access crossing downstream of the dam;
* Protection of the left bank (Provision Item)



Icon
Interested to find more tenders relevant to you and your business? You can try our advanced tender search today.