Part of the execution of the South Flank enabling work requires a range of modifications to the existing Mining Area C plant including:
* Shop detailing, fabrication and installation of 2 new conveyors to tie in to a 6Mtpa crushing plant;
* Installation of a new free issue bulking-in hopper;
* Structural strengthening to existing conveyors;
* Upgrading/burying sections of 33kV overhead powerline (cable free issued);
* Services install to support above noted equipment; and
* Based on the Company supplied detailed design the contractor shall complete all construction, installation of instrumentation and control systems and no-load commissioning.