Julimar-Brunello Phase 2 Project - Subsea Connectors Supply
Tender ID: 383829
Tender Details
Tender Description
Subsea 7 scope of work for Julimar Development Phase 2 involves the project management, engineering, procurement, fabrication and installation of the following packages of work:
* One 6-slot Julimar A manifold (transport and installation only);
* 22km long 18” NPS CRA clad flowline from the Julimar A manifold (JULA) to the existing Brunello Crossover manifold (BRUA-XoM), that includes one 12” NPS In-Line Tee (ILT) for future expansion and two 18” NPS Flowline End Terminations;
* 18” NPS CRA clad expansion tie-in spools connecting the flowline FLETs to the JULA and BRUA-XoM manifold (qty-3);
* 8” NPS Duplex rigid well jumpers connecting Wells to the JULA manifold (qty-4);
* One Spools Connection Assembly structure;
* 22km long EHU split into 2 sections (a break point in the EHU is required at the ILT location for future expansion) and comprising HP & LP hydraulics, MEG and Chemical injection cores, as well as electrical power cores and fibre optics for field control and communication;
* EFLs and HFLs connecting various subsea hardware components;
* Testing and pre-commissioning operations.
The scope of supply for the Subsea Connectors Package includes fabrication and delivery of the following:
* Inboard & Outboard subsea connectors for 18” rigid spools to FLET connections (qty 3 off IB & OB sets);
* High Pressure Caps for all inboard hubs;
* Low Pressure Caps for all outboard hubs;
* Gasket Test Panels for all Connection Locations;
* Onshore Fabrication & Test Equipment.
Supplier shall also provide all associated ROV tooling required to operate the connector systems, on a rental basis.
Further details on the Julimar Development Phase 2 can be found via the following link: https://JulimarBrunello.icn.org.au