BAE Systems Hunter Class Frigate Program - CAT C - Pipe Support Manacles
Tender ID: 386964
Tender Details
Tender Description
BAE Systems are seeking Expressions of Interest (EOI) to supply ships with Pipe Support Manacles for the Hunter Class Frigate Program (HCFP).
BAE has recently been down selected to design and build the Royal Australian Navy’s (RAN) future frigates.
The BAE Systems Future Frigate offering, also known as the Hunter Class GCS-A (Global Combat Ship – Australia) is a variant of the British Type 26 GCS (T26).
The Hunter Class Frigates will be built at the ASC Shipbuilding Facility at Osborne, Adelaide, SA.
The purpose of the Capability Questionnaire is to establish the feasibility of prospective industrial partners to provide Pipe Support Manacles to BAE Systems for the HCFP.
The Hunter Class Program will require maximisation of local content in Australia.
Suppliers will be required to supply Pipe Support Manacles with the below specifications:
• Single Leg Manacles (80NB and below - exc Exhaust Gas Manacles)
- Type 1 (150/400mm legs) - Flat bar at 90° (vertical) to the manacle bolting lugs, orientated perpendicular to the pipe centre line.
- Type 2 (150/400mm legs) - Flat bar at 90° (vertical) to the manacle bolting lugs, orientated in plane with the pipe centre line.
• Double Leg Manacles (100NB and above but including Exhaust Gas Manacles)
- Standard Configuration - Two 150mm legs spread at 60° (±30° from vertical for each leg). Another two legs are bolted to these which then bend inwards to bolt to the lug perpendicular to structure.
- Short Configuration - Two legs that join parallel to the manacle and bend 90° to bolt to the lug perpendicular to the structure.
- Alternative Configuration - Two 200mm legs spread at 60° (±30° from vertical for each leg). Legs are welded directly to structure.
- Exhaust Gas Manacle - Two 150mm legs spread at 60° (±30° from vertical for each leg). Another two legs are bolted to these which then bend inwards to bolt to the lug perpendicular to structure.
• Rotated Manacles (All Pipe sizes)
- Single and Double Leg Hangers (as detailed above) shall be available with the manacle ring rotated 20° about the pipe centre.
- Manacles used in Tanks and Short Double Leg Hangers are not available as rotated parts.
BAE SYSTEMS – IN – CONFIDENCE
Including Capability SOW / Questionnaire
HCFP Pipe Support Manacles Capability Questionnaire FINAL Page 5 of 5
• Pipe Hanger Lugs
Location
New South Wales : Central West : Far North Coast : Far West : Hunter : Illawarra : Mid North Coast : Murray : New England : Orana : Riverina : Southern Highlands : Sydney
Queensland : Cairns & Far North Queensland : Gladstone : Mackay Whitsunday Region : Mount Isa & North West Region : Rockhampton : South East Queensland : South West & Darling Downs : The Central West : Townsville : Wide Bay Burnett
Victoria : Barwon South West : Gippsland : Grampians : Hume : Loddon Mallee : Melbourne
South Australia : Adelaide : Eyre & Western : Far North : Fleurieu & Kangaroo Island : Limestone Coast : Murray & Mallee : York & Mid North
Northern Territory : Big Rivers : Central Australia : East Arnhem : Greater Darwin
Australian Capital Territory
Tasmania