Closed

Julimar-Brunello Phase 2 Project - Manifold and MudMat

Tender ID: 393124


Tender Details

Tender #:
OSS-JP2-001  
Status:
Closed
Publish Date:
10 August 2019
Closing Date:
23 August 2019

Tender Description

OnseSubsea scope of work for Julimar development phase 2 involves the project management engineering, procurement and fabrication of the Subsea Six slot manifold.


Fabrication activities by Subcontractor shall include, but not limited to :
One Subsea 6 slot production manifold – Consisting of;

  • 8” & 12” Header Valves and 8” Branch Valves (OneSubsea Free Issue)

o Piping & Bends (22 CR Duplex SS - UNS S31803)

  • 12.75” Header Pipe with six 8.625” Branch Lines

o Connection & Pressure/Debris Caps

  •  OneSubsea Supplied

o Small Bore Hydraulic/Chemical Injection Items

  • Hydraulic Tubing

o Controls Equipment

  • OneSusbea Supplied

o Structural Beams, Pipes, Plate & Channel


Scope includes fabrication of manifold structure, coating, installation of free issue valves, piping fabrication, hydraulic tubing installation and associated factory acceptance tests.


One Subsea MudMat for Six Slot manifold – Consisting of;
o Structural Beams, Plate & Channel

Scope includes fabrication and coating of structure and associated factory acceptance tests.
Quayside loadout onto Contractor vessel – Henderson, WA
 


Location


Icon
Interested to find more tenders relevant to you and your business? You can try our advanced tender search today.