R305 - Civil Works, Parks Works and Pontoon Installation

Tender ID: 428458


Tender Details

Tender #:
C-2021-7  
Status:
Closed
Publish Date:
11 August 2020
Closing Date:
18 September 2020

Tender Description

The Civil Works, Park Works, Pontoon Installation Contract consist of the following packages of work, with each package having a unique scope:

Please note that non confornimng tenders for any parts of the packages will be accepted. This tender does not require pricing for every item in every package and we encourage you to submit pricing on items your company can supply.

We understand that the works involved are various which is the reason for accepting non con-forming tenders.

Package A – Civil Works

Package B – Park Works

Package C – Pontoon Installation

 

The Works under the Contract shall include, but not be limited to:

  • preliminaries, including provision of own Site facilities;
  • transportation, unpacking and repacking the Corporation owned containers and equipment;
  • complete container inventory list and submit to Superintendent within 14 days of completion of works. List must include container number, contents, quantities, condition report of containers and contents

A. Civil Works

The works under this Package shall include, but not be limited to:

  • preliminaries, including provision of own site facilities;
  • transportation, unpacking and repacking Corporation owned containers and equipment;
  • construction and removal of temporary pavements;
  • construction and removal of fuel storage compounds;
  • installation, removal and restoration of gravel run-off traps;
  • exposure, preparation and remediation of footings for Overpasses, CCTV and Camera towers
  • application of road and line marking;
  • painting of track infrastructure;
  • manufacture, installation and removal of track safety signage;
  • preparation, installation and removal of permanent and temporary race kerbs;
  • treatment of service pits and gas meters;
  • cleaning of the track surface;
  • installation and removal of spreader bars and timber sleepers;
  • installation and removal of conveyor belting, tyre inserts and shade cloth covers to tyre buffers;
  • installation and removal of TECPRO barriers;
  • supply, installation and removal of concrete slab for FOM facility;
  • miscellaneous minor civil works;
  • provision of Event period standby crews.

B. Park Maintenance & Restoration

The works under this Package shall include, but not be limited to:

  • preliminaries, including provision of own site facilities;
  • maintenance and presentation of the Parklands including playing fields;
  • maintenance and presentation of Track Verges;
  • placement and removal of woodchips;
  • provision of a standby crew during the Event period for maintenance and rectification; and
  • restoration of park grass areas including ovals.

The maintenance of the parklands includes, but is not limited to, the progressive takeover of the maintenance of various areas of Albert Park from Parks Victoria, including aeration, watering, fertilising and mowing to ensure that all turf and ground surfaces are well grassed, neat in appearance and present uniform green, healthy grass.

Maintenance of the track verges includes, but is not limited to, aerating, fertilising, watering, mowing and other works to ensure the track has the highest presentation standards for the Event.

Woodchip works include, but are not limited to, the supply, placement and subsequent removal of woodchips, used in the Event of wet weather, and also for decoration and dust suppression.

Park Restoration includes, but is not limited to, aeration, top dressing, seeding, fertilising, watering and mowing on ovals, fields, barrier line, gravel trap areas, general grassed areas and temporary hardstand areas to ensure that the park is returned to Parks Victoria to a condition equal or better than the condition prior to Corporation occupation.

C. Pontoon Installation

The works under this Package shall include, but not be limited to:

  • preliminaries, including provision of own Site facilities;
  • traffic management internal to the Site related to the Contractor’s movements;
  • transportation, unpacking and repacking the Corporation owned containers and equipment;
  • installation and removal of the pontoon structure as detailed on the Drawings and in this specification;
  • structural certification of completed structure;
  • supply on hire, installation, maintenance and removal of appropriate waterways warning buoys;
  • provision of a standby crew during the Event period to supervise, monitor, maintain and rectify the pontoon structure 

Location

Victoria   :   Melbourne  