Awarded

Dismantling and Disposal of Plant and Infrastructure

Tender ID: 445888


Tender Details

Tender #:
CBE14  
Status:
Awarded
Closing Date:
7 April 2021
Awarded Date:
29 April 2021

Tender Description

The Bloodwood Creek Underground Coal Gasification (UCG) site (the Site) became an abandoned mine in March 2019, following the disclaiming of mining tenures held on the land. Both surface and sub-surface infrastructure remains on site, including several wells for UCG processes and water monitoring, a gathering network, process water management equipment and a power generation plant with associated infrastructure. These items present health, safety and environmental risks that need to be assessed and managed by Technical Services (TS), in line with the Abandoned Mines Management Policy.

 
This aims to remove all redundant plant, equipment, buildings, and infrastructure to render the site in as safe a condition as practicable.
 
 


Icon
Interested to find more tenders relevant to you and your business? You can try our advanced tender search today.