EnergyConnect - SecureEnergy JV - Aborist Services
Tender ID: 476591
Tender Details
Tender Description
Secure Energy wish to identify Suppliers that have the capacity to provide qualified Level 4 or Level 5 Arborists.
Works will include:
• The assessment and identification of vegetation against transmission line vegetation clearing requirements to be removed across the project area including species identification and growth rate assessment with reference to LiDAR survey, design and project specifications.
• The assessment of ‘hazard trees’ on and outside the transmission line easements,
• GPS tagging of vegetation to be removed and / or trimmed,
• Reporting on findings for each section of work including vegetation clearing plans, and
• Pre energisation check of clearing activities completed verified against LiDAR survey, design and project specifications including reporting on findings for each section of work.
Assessments with span circa 700km of easement from the SA boarder to Wagga Wagga and will need to be completed in approximately 6 months. Pre Energisation checks will be conducted at the end of the project in 2023.
Opportunity Description. Secure Energy wish to identify Suppliers that have the capacity to provide qualified Level 4 or Level 5 Arborists.
Works will include:
• The assessment and identification of vegetation against transmission line vegetation clearing requirements to be removed across the project area including species identification and growth rate assessment with reference to LiDAR survey, design and project specifications.
• The assessment of ‘hazard trees’ on and outside the transmission line easements,
• GPS tagging of vegetation to be removed and / or trimmed,
• Reporting on findings for each section of work including vegetation clearing plans, and
• Pre energisation check of clearing activities completed verified against LiDAR survey, design and project specifications including reporting on findings for each section of work.
Assessments with span circa 700km of easement from the SA boarder to Wagga Wagga and will need to be completed in approximately 6 months. Pre Energisation checks will be conducted at the end of the project in 2023.
Equipment used should all be fitted with GPS Tracking and Operator Fatigue Management systems where appropriate.
Equipment should be to Industry safety and maintenance standards.
Arborists shall be level 4 or 5 qualified.