Closed

Hydrogen Supply Chains - Nitrogen Plant and Sub-components

Tender ID: 512341


Tender Details

Tender #:
-  
Status:
Closed
Publish Date:
3 March 2023
Closing Date:
10 March 2023

Tender Description

Nitrogen Plant and Sub-components

 
The South Australian Hydrogen Supply Chain study will be broken down into key products and services, which will be included in an SA Hydrogen Supply Chain Capability Directory.
 
The following list is an indication of key goods and services required for the building a Nitrogen Plant and Sub-components. The list is not exhaustive, and if you supply any items or services that are not listed, please provide a description through your expression of interest.
 
• Managing Contractor
• Engineering and Design
• Air Compressors
• Cooling Fan
• Dehydrator
• Coalescer Filters
• Pressure Instruments
• Process Heater / Immersion Heater
• Carbon Filter Vessel
• Particulate Filter
• Membrane Air Separation Unit
• Oxygen Analysers
• Purity Valve
• PLC
• High Pressure Storage Tank
• Flow Meters
• Piping
• Storage Tanks
• Fire Systems


Icon
Interested to find more tenders relevant to you and your business? You can try our advanced tender search today.