Olive Downs Complex - Internal Access Road and Drainage

Tender ID: 515864


Tender Details

Tender #:
-  
Status:
Closed
Publish Date:
11 January 2023
Closing Date:
25 January 2023

Tender Description

Scope of Work

 
The high-level scope of work for this work package includes the following:
 
 preparation of Contractor management plans to demonstrate how the Contractor will perform the works in accordance with the Principal’s HSMP, CEMP, Design Documentation and other Approvals and Compliance documents
 staging, construction and maintenance, including dust suppression, of haul roads required by the Contractor for the performance of the Work
 all temporary Work as required by the Contractor to complete the Works
 survey
 construction of the Internal Access Roads of approximately 2km, including but not limited to the following:
 
o stripping of topsoil
o general earthworks construction comprising excavation, placement and compaction of excavated or imported competent fill to the lines and levels indicated as per applicable drawings
o supply/import of material complying to earthworks specification for the Internal Access Roads
o supply/import of pavement complying to earthworks specifications for the Internal Access Roads
o construction of multiple culverts along the various access roads
o Supply and installation of road furniture
o construction of erosion protection where required
o topsoiling, seeding and hydro mulching where required
 
 Excavation of local minor drains around the site
 construction of any Contractor required buildings and facilities including earthworks pads and pavements
 local area topsoil stripping and replacement
 installation of permanent surface treatments and rehabilitation of disturbed areas
 protection and maintenance of temporary works and permanent works within the Contractor’s Site until Completion
 Level 2 Geotechnical testing, supervision and certification in accordance with AS3798 for earthworks operations in accordance with the Design Documentation
 testing of the in-situ foundation material and removal and replacement with competent material (in accordance with the Design Documentation)
 testing of imported granular and rock material
 disposal of all unsuitable or spoil material to a nominated spoil areas as agreed with Pembroke.
 dust suppression for the duration of the works
 traffic management for the duration of the works
 
Construction water will be supplied by Pembroke onsite, the Contractor will be responsible for collection and transport