CopperString 2032 - Stringing Installation

Tender ID: 538799


Tender Details

Tender #:
-  
Status:
Closed
Publish Date:
27 September 2023
Closing Date:
10 November 2023

Tender Description

Copper String 2032 is undertaking a market evaluation to identify suitably capable, qualified local, regional and national businesses that have the ability to provide Transmission Stringing Installation for the Copper String 2023 project.

1. Preliminary Activities:

• Review engineering drawings, conductor specifications, and project plans to understand stringing installation requirements.

• Conduct site surveys to identify potential obstacles or hazards and develop mitigation measures.

• Identify all necessary materials, equipment, and resources for the stringing installation.

2. Stringing Equipment Setup:

• Mobilise and set up stringing equipment, including pulling machines, tensioners, and stringing blocks.

• Calibrate, test, and certify all stringing equipment for safe and efficient operation.

3. Stringing Installation Execution:

• Attach conductors to pulling lines and carefully thread them through designated routes between transmission towers.

• Coordinate with other project teams to synchronise stringing activities with tower erection and other construction phases.

• Monitor tension levels to prevent conductor damage during installation.

• Implement appropriate safety measures and adhere to relevant safety guidelines.

4. Quality Control and Inspection:

• Conduct quality checks on installed conductors to verify compliance with project specifications and industry standards.

• Perform regular inspections of stringing equipment for optimal performance and safety.

• Address any non-conformities and take corrective actions promptly.

5. Environmental Considerations:

• Implement measures to minimise environmental impact during stringing installation, such as erosion control and protection of sensitive areas.

• Adhere to environmental regulations and requirements set forth by relevant authorities.

6. Documentation and Reporting:

• Maintain detailed records of all stringing installation activities, including progress reports, safety logs, quality control checks, and equipment maintenance records.

• Provide regular updates to the project management team regarding the status of the stringing installation work.

7. Health, Safety, and Environment (HSE):

• Prioritise safety during the stringing installation phase, following relevant safety standards and protocols to prevent accidents or incidents.

• Ensure the stringing installation team is equipped with appropriate personal protective equipment (PPE) and undergoes necessary safety training.