TIOM & MNW Projects – Request for Expressions of Interest

Tender ID: 542934


Tender Details

Organisation:
Tender #:
SWC-WS4271253074  
Status:
Closed
Publish Date:
3 November 2023
Closing Date:
17 November 2023

Tender Description

Sydney Water is pleased to issue this Expression of Interest to the market. The market plays an important role in delivering Sydney Water’s growth objectives and we welcome your expertise as we embark on the formal procurement process.

Thornleigh Inlet/Outlet Main Project (TIOM):

Thornleigh is located in the Hornsby Shire Local Government Area (LGA) in the northwest of Sydney. The water infrastructure in Thornleigh forms part of the Prospect North water delivery system. A schematic of Prospect North Water System is shown in Figure 1. Water is supplied to Thornleigh Reservoir WS0148 from Prospect Water Filtration Plant via Prospect pump station (WP0239). Water is then gravity fed from WS0148 to WPS WP0159 from where it can be pumped north to Wahroonga, or gravity fed back towards Prospect / Rogans Hill to supply network offtakes.

The increased demand due to growth will make utilising the existing water quality management cycling pattern increasingly difficult to manage. To address these issues a duplication of an existing DN1800 main is proposed. The primary benefit of the project is to support growth and maintain water quality at Thornleigh Reservoir, increasing system reliability and resilience.

Metro Northwest Project (MNW):

Rouse Hill System has been non-compliant with its wet weather overflow requirement of 12 overflows per 10 years for over 6 years and continued non-compliance creates a risk to SW’s Operating License. The compliance constraint is related largely to the inability to pass forward adequate flows from network pump stations to the treatment plant due to:

  • inadequate wet weather treatment capacity at the treatment plant.
  • inadequate network pump station capacity and constraints on the capacity of the pipeline transferring flows to the Rouse Hill Water Recycling Plant (WRP).

Wet weather capacity at the plant is currently being upgraded under the Rouse Hill Compliance project. MNW will relieve the pipeline and pump station constraints and service forecast growth of approx. 22,000 new dwellings by 2026. MNW works are planned in 2 stages:

  • Stage 1 - construction of a single DN1000 rising Main inside a bored tunnel from Pump Station SP1022 to Rouse Hill WRP New Inlet works (approx. 900m), and interim pump station upgrades.
  • Stage 2 - a second pump station upgrade to increase the capacity to meet wet weather overflow compliance requirements to 2046.

Through this Expressions of Interest (EOI) process, Sydney Water invites Proponents to demonstrate they have the right experience, capability, understanding and commitment to work with Sydney Water as our delivery contractor to deliver the scope, objectives, assets and more.

We are seeking a delivery contractor who has a sound understanding of design development and construction of pipelines, bored tunnels and pump station upgrades.

We look forward to your participation and engagement.