Moondarra Spillway and Plunge Pool Upgrade – Stage 2
Tender ID: 574485
Tender Details
Tender Description
This specification details the requirements for the stabilisation and surface protection of the existing rock face and plunge pool at the Moondarra Reservoir spillway. Works stages have been defined to mitigate risks associated with vertical interaction during construction. The works stages are defined below:
• Stage 1 comprises of works at the crest of the rock face in areas with existing shotcrete protection - Complete
• Stage 2 comprises of works on the steeply dipping rock face – This Contract
• Stage 3 comprises of works at the toe of the steeply dipping rock face and in the plunge pool floor. – Future Works